Customer Benefits

Lean control
production planning
Minute level
medium-to long-term planning
Multi-objective optimization
reduce production cycle time
Problems faced
  • 1. Poor coordination in production scheduling between multiple factories for final assembly and sub-assembly.
  • 2. Data silos and lack of real-time feedback on production information in the planning and scheduling layer.
  • 3. Manual scheduling cannot guarantee accuracy and rationality, making it difficult to achieve overall optimization of the entire process; difficulties in checking material compatibility and high inventory levels.
UHAlean Solution
  • Carry out data sorting and integration for various factories, establish a unified production intelligent decision-making management platform, and build a collaborative production system that links the production plan of the final assembly plant and the sub-assembly plant.

  • Develop medium and long-term master plans and short-term daily plans.

  • The system can conduct material check based on inventory information of stock, work-in-progress, and in-transit, make a rapid evaluation, and achieve rational planning of personnel, machinery, and materials, thus reducing the inventory level.

  • The system synchronously considers material supply constraints and production capacity constraints, calculates the accurate changeover time point for the production line, reduces changeover time, and improves production efficiency.